Mechanical Survey – Trunnion Installation at Pinnacle Plant

The scope of work includes surveying in the location/reference lines and elevation of two  bases upon which sat two Trunnion wheels each. Nana Geomatics had to make sure that the front and rear Trunnion bases and anchor bolts were installed within spec so the dryer could be mounted on top and function safely.

Survey Services

  • Marking of centerlines and working points
  • Ensure wheels are setup to be equal distance from CL,
    shafts are parallel, and wheels aligned within 0.4mm horizontal
  • Ensure Trunnion wheels are level to each other within 0.13mm

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*