Queen Elizabeth II Highway / 41 Avenue SW Interchange Project – City Of Edmonton, Alberta

QE2Hway41Ave
Queen Elizabeth II Highway / 41 Avenue SW Interchange Project – City Of Edmonton, Alberta

The scope of work includes:

Road Realignment improvement, layout of the new interchange, Earthwork, installation of storm sewer, Grading, installation of flow control devices for the storm water management ponds west of QEII Highway.

        • O.G, stockpile, as-built, topsoil and subsoil pick up
        • Layout of new bridge over Blackmud Creek
        • Embankment slope stake, ditches and baseline layout
        • Grade check on G.B.C, on asphalt , embankment side slope
        • U/G utility layout and As-Built

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*