Pinnacle Energy – Entwistle Plan Site Construction

The scope of work includes:

Construction layout of plant site including; furnace, pellet building, hammer mills, silo, various reclaim decks and conveyors. Earthworks layout consisting of clearing/stripping, grading, and fill for rail track alignment, new access road. Installation of electrical trenches, installation of flow control devices for the storm water management ponds.

        • Performed subgrade layout using DTM and line works with TSC3
        • Established control networks using least square adjustments
        • Performed high precision levelling (± 0.3 mm) for large machinery (400 000 lbs)
        • Performed high precision survey (± 3mm) for pipe rack, pile layout, pile cut off, cap alignment, form checks, and top of concrete elevations
        • Layout grid line, working points, anchor bolt(± 3mm), steel, and plates
        • Vertical/horizontal alignment for railway tracks connecting to CN rail line
        • Final as-built and QC/QA sheets for the turn over package