HAT AT 5 CORNERS HIGH RISE – Edmonton

The scope of work includes:

Layout at the parkade level including; columns, walls and elevator shaft.

        • Layout of grid lines, working points, and column/wall corners
        • Layout of drainage pipes and grading for rain water drainage

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*