Industrial Plant Construction At Christina Lake/ Foster Creek Project– Cenovus Energy, Alberta

CenovusChristinaLake
Industrial Plant Construction At Christina Lake/ Foster Creek Project– Cenovus Energy, Alberta

The project includes:

Performed high precision survey (± 3mm) for structure pipe rack such as:
        • Pile layout, Pile Cut Off, Cap Alignment, forms check, T.O.C level
        • Layout grid line, anchor bolt, steels and plates
        • QC/QA before and after the module is installed
        • Layout flow line, and Access roads

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*